Considerations in Elevator Installation

First, in order to avoid any work accidents during the installation process, all safety measures must be applied at all stages of the installation, and all precautions must be taken. OHSAS protection and response tools must be available and operationally ready. We can summarize the following mounting steps and some points to note in these steps, respectively, as follows:

Assembly Preliminary Process

The apparatus, machinery and equipment required for installation are checked to be ready for operation.
The existence of the materials according to the project technical documents is inspected, numerical control and damage control are observed visually.
The bottom of the well is checked for wetness, no humidity and the bottom of the well is empty.
The control of the electrical installation is checked, and the presence of the main supply line is checked according to OSH regulations and technical documents.
According to OSH rules, the stability of the well in the well is checked.
It is checked whether the position of the scaffold affects the elevator measurements to be made according to the technical documents.
The efficiency of the working distance is checked by checking or observing where necessary.
Rail Mounting

According to the values ​​given in the technical documents, the gauge should be determined in the upper and lower spaces of the well.
With reference to the upper master, the jug should be thrown and the lower gauge fixed.
It should be fixed in place instead of wall brackets.
The first size rail should be taken to the well according to OSH regulations.
Floor Doors Installation

The track rail distance is checked according to the dimensions specified in the technical documents.
The specifications required in the technical instructions must be adjusted to operate the door.
Installation of Elevator Drive System

The mechanical assembly of the machine stand insulation material, the machine stand and the machine motor on the stand must be done according to the specifications and instructions specified in the technical documentation.
Cab and Counter Weight Installation

The cabin carrier frame and the counterweight frame should be installed on the level between the rails.
The system should be operated in accordance with the technical procedure and the weight of the cargo should be aligned with the carrier scaffold.
The ropes should be cut in the sizes specified in the technical documents.
Check that the floor of the car is leveled and mount it on the skeleton at the appropriate distance from the door.
Cabin side walls, cabin ceiling, cabin equipment should be installed according to the technical documents.
Speed ​​Regulator Installation

The regulator and the regulator rope must be installed according to the specifications specified in the technical documents and the operating condition of the mechanism.
Installation of Control Systems and Construction of Electrical Installation Connections

With reference to the measurements given in the technical documents, the location of the control panel is determined and assembled.
Electrical connections, control system connections, lighting, photocells, fan connections must be made in accordance with the electrical installation project specified in the technical documentation.
Assembly of Well Dibi Elements

The cabin and counterweight buffers, counterweights separator, wellbore staircase, balance chain (weight) and balance chain should be checked for compliance with the technical documentation and standards.